H-Band 

· Temporary repair of flanged joints on pipe lines.

· Carried out under pressure with no shut down required.

· Seal of joint safe for 5 to 10 years, however the installed clamps are proving to out last their expected life.

· This temporary solution provides a bespoke, in expensive and rapid solution to leaking joints.

· Each situation dealt with on an individual basis to provide a tailored solution.

· Survey, Design, Manufacturer and Installation carried out within a couple of days if necessary.

· Suitable where the alternative is replacement of the pipe, requiring costly and lengthy planning when fines from e.g. the council may also be added.

 