H-
Clamp
Temporary repair of lead filled joints on pipe lines.
Carried out under pressure with no shut down required.
Seal of joint safe for 5 to 10 years, however the installed clamps are proving to out last their expected life.
This temporary solution provides a bespoke, inexpensive and rapid solution to leaking joints.
Each situation dealt with on an individual basis to provide a tailored solution.
Survey, Design, Manufacturer and Installation carried out within a short time frame.
Suitable where the alternative is replacement of the pipe, requiring costly and lengthy planning when fines from e.g. the council may also be added.
‘Leaking pipe joint cured using H-
Clamp’